







The starting and ending intersections of the Asadabad bypass, Khandab River Bridge
Main project operations
-1Earthworks for the construction of the bypass in the intersection area and ramps and loops of the intersection and deceleration and acceleration lanes according to the typical transverse and other transverse sections of the area
-2Construction of technical building operations including culverts – bridges – walls and protective works according to the plans
3-Construction of 7 bridges related to the grade separated intersection
4-One bridge with a span of 20 meters – one bridge with a span of 25 meters – 2 bridges with a span of 17.5 meters, two bridges with a span of 15 meters and one bridge with two spans of 22.5 meters
5-Construction of a two-span bridge of 15 meters on the Khandab River
6-Pavement operations and installation of guide signs and road markings
