This 10-kilometer project was carried out under the supervision of the General Directorate for Construction and Development of the Region 5 Transportation Network and Ayough Rahvar Consulting Engineers Company, by Chavosh Rah Bana Company
Main operations of the project:
- The construction of the Asadabad bypass with a finished width of 2.00 x 11 meters was carried out as a renovation with two separate return lanes
- The construction of roadside drainage channels on both sides of the route, 2 meters from the embankment toe, has been carried out according to the typical cross-sectional plan