The Asadabad-Kangar road project was carried out under the supervision of The Asadabad-Kangavar axis project was implemented by Chavash Rah Bana Company under the supervision of the Deputy for Road Network Construction and Development and Vinesar Consulting Engineers.
Main project operations:
Execution of earthworks (including embankment and excavation)
Procurement of materials and carrying out all technical building operations, including bridge construction, etc.
Preparing materials and implementing foundation operations, including foundation and sub-foundation.
Preparation of materials and implementation of paving operations (Topka and binder)
Carrying out all miscellaneous operations, including the preparation and installation of signs, markings, guardrails, and all operations necessary for the operation of the project.
The total length of the section is 24.420 kilometers, starting from kilometer 0000+00 of the Hamedan-Sanandaj axis and continuing after the village of Hamkesi towards Dashbolagh to kilometer 24.420 at the end of the section.