The construction of the second lane of the Hamadan-Sanandaj road was carried out under the supervision of the Department of Road Construction and Development of the Northwest region and Taradod Rah Consulting Engineers by Chavosh Rah Bana Company in the form of 3 contracts
Construction of the second runway of the Hamedan-Sanandaj highway under the supervision of the Northwest Regional Road Construction and Development Department and traffic consulting engineers by Chavash Rah Bana Company in the form of 3 implementation contracts
Main operations of the project:
The total length of the section is 24/420 kilometers, starting from kilometer 000+00 of the Hamadan-Sanandaj axis and continues after the village of Hameh Kasi towards Dashbolagh to kilometer 24/420 at the end of the section
1- Carrying out all earthworks
2- Construction of technical buildings
3- Construction of 17 bridges from kilometer 000+00 to 500+6
4- Construction of 35 bridges from kilometer 500+6 to 800+22
5- Implementation of paving and asphalt operations
6- Implementation of protective operations including construction of canals, diversions, and construction of necessary technical buildings
7- Construction of parking on the right side and road
8- Construction of branch roads at the junction, with a length of 200 meters, and asphalting them
9- Carrying out line drawing operations – preparing and installing guardrails, road signs and painting