This 10-km long project was implemented under the supervision of the General Directorate of Construction and Development of Area 5 Transport and Logistics Consulting Engineers Co., Ltd., by Chavosh rah bana co
:Main project operations
A:Construction of Asad Abad Passage Construction in the finished area equal to 11.00 * 2 meters was completed by renovation with two separate runways and bands
B:Construction of a canal in the direction of the road on the sides of the axis, 2 meters from the heel of the embankment, according to the cross-sectional map